firetube 1 5 ton boiler

If you run into any problems with the boiler, please contact us directly by email or fill out the online service request.
We will do our best to resolve any problems you might have within 24 hours.

Our Cases Contact Us

TEL:+86 13506151331
E-mail: [email protected]
address:No. 76, Xin Da Road, Zhou tie Town, Yixing, Wuxi, China

zozen boiler
  • Boiler name: firetube 1 5 ton boiler

  • Boiler Distributor:Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization

  • Email:[email protected]

  • Please email or call us for your inquiry

firetube 1 5 ton boiler

Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization; The explosion door and flame detector are equipped for safe and reliable operation. Comb plates are used between both sides of boiler and tube bundle to avoid leakage of condensate and gas caused by using refractory concrete as sealing material. Air proof test is done before delivery in the factory to guarantee any gas leakage problem.

Big combustion chamber equipped with Low emission combustion burner effectively reduce the NOx to 30mg/m3. Smoke duct and smoke outlet use internal insulation to reduce operating noise.Combustion chamber uses full membrane water cooling wall structure and pressurized combustion without smoke mixture.

zozen boiler zozen boiler zozen boiler

    Directory of South African Manufacturing websit

    A listing of Manufacturing websites in South Africa. Impact Displays Manufacturers: point of sale products, collapsible display stands, brochure, magazine holders and table talkers, vac vacuum forming, Perspex and plastic fabrications.

    Contact us

    บอยเลอร์ - boilerthailand เว็บไซต์ศูนย

    we have some problem about hot air boiler system in the line products .This problem is have little black dust at end tube before exhaust hot air to the process tube . We

    Contact us

    Tube Removal - Elliott To

    Elliott’s Collet Style Tube Tugger was designed for fast and efficient tube removal in condensers, chiller, and other heat exchangers. With its 6 Ton pulling capacity, the Collet Style Tube Tugger automatically grips, pulls, and releases the tube in a matter of seconds.

    Contact us

    Boiler Maintenance - Elliott To

    Elliott’s 3400 Series Flaring Boiler Expanders are the recommended tube expanders for expanding and flaring tubes in Firetube and watertube boilers.

    Contact us

    Continental engineers - Steamind

    Continental engineers. This is an arbitrary division forced by the limitations involved in handling large files. Abt, Roman Born in Bunzen, Switzerland on 17 July 1850 and died Lucerne 1

    Contact us

    IndustrialMachines.net - Search Resul

    This mini digger/excavator is a 2017 model showing 450hrs with an unladen weight of 2770kg. It comes with a quick hitch, dozer, 4 buckets, Yanmar engine with 1

    Contact us

    Energy – Just Fac

    * Two common measures of energy are British thermal units (Btu) and joules. All forms of energy can be expressed in these units. One Btu is the amount of energy needed to raise the temperature of one pound of water from 39 to 40 degrees Fahrenheit. One joule is the amount of energy needed to lift one hundred grams (3.5 ounces) upward by one meter (3.3 feet) while on the surface of the earth.

    Contact us

    High-Performance HVAC | WBDG - Whole Buildin

    Heating, ventilating, and air-conditioning (HVAC systems) account for 39% of the energy used in commercial buildings in the United States. Consequently, almost any business or government agency has the potential to realize significant savings by improving its control of HVAC operations and improving the efficiency of the system it uses.

    Contact us

    Your Boiler Room: A Time Bomb? - Aso

    A real life event: About 1:50 pm on June 18, 2007, boiler #2 (TN#: T24059) located at the Dana Corporation plant in Paris, Tennessee, exploded causing extensive damage to the

    Contact us

LEAVE YOUR MESSAGE !

7*24 hours of counseling service, offering the most effective and fastest service to ensure that
the loss caused by the failure for customers is minimized.

Contact Us